Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11599
Title: Performance measure of metro rail project using social benefit cost and life cycle costing analysis.
Authors: Nayak, Sarverkhan M.
Guide: Sarkar, Debasis
Issue Date: 2013
URI: http://hdl.handle.net/20.500.12725/11599
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0239.pdf
  Restricted Access
2.47 MBAdobe PDF Request a copy
CPM TH-0239 Summary.pdf199.71 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.