Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/2467
Title: | Time and cost control techniques for construction projects. |
Authors: | Vaidya, Nirav B. |
Guide: | Divanji, Parimal Y. |
Issue Date: | 1997 |
URI: | http://hdl.handle.net/20.500.12725/2467 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Size | Format | |
---|---|---|---|
B TH-0105.pdf Restricted Access | 46.82 MB | Adobe PDF | Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.