Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11737
Title: Time and cost overruns in metro projects.
Authors: Desai, Jaynil Hargovindbhai
Guide: Shah, Reshma
Issue Date: 2015
URI: http://hdl.handle.net/20.500.12725/11737
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0580.pdf
  Restricted Access
3.15 MBAdobe PDF Request a copy
B TH-0580 Summary.pdf284.03 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.