Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11752
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPandit, Devanshu-
dc.contributor.authorMunshi, Avik-
dc.date.accessioned2020-11-04T10:33:44Z-
dc.date.available2020-11-04T10:33:44Z-
dc.date.issued2015-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11752-
dc.titleCost optimization for road construction equipment in India.-
dc.barcode014841-
dc.pagesix,57,xiip.,CD-ROM-
dc.classnoB TH-0594 MUN-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0594.pdf
  Restricted Access
3.35 MBAdobe PDF Request a copy
B TH-0594 Summary.pdf71.58 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.