Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11752
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Pandit, Devanshu | - |
dc.contributor.author | Munshi, Avik | - |
dc.date.accessioned | 2020-11-04T10:33:44Z | - |
dc.date.available | 2020-11-04T10:33:44Z | - |
dc.date.issued | 2015 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.12725/11752 | - |
dc.title | Cost optimization for road construction equipment in India. | - |
dc.barcode | 014841 | - |
dc.pages | ix,57,xiip.,CD-ROM | - |
dc.classno | B TH-0594 MUN | - |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0594.pdf Restricted Access | 3.35 MB | Adobe PDF | Request a copy | |
B TH-0594 Summary.pdf | 71.58 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.