Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11844
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPandit, Devanshu-
dc.contributor.authorMistry, Jayash-
dc.date.accessioned2020-11-04T10:35:04Z-
dc.date.available2020-11-04T10:35:04Z-
dc.date.issued2017-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11844-
dc.titleFactors leading to cost overruns in highway projects.-
dc.barcode018544-
dc.pagesxv,vii,39p.,CD-ROM-
dc.classnoB TH-0679 MIS-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0679.pdf
  Restricted Access
2.38 MBAdobe PDF Request a copy
B TH-0679 Summary.pdf97 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.