Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11863
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorTewar, Bhargav-
dc.contributor.authorPatwa, Nisarg-
dc.date.accessioned2020-11-04T10:35:15Z-
dc.date.available2020-11-04T10:35:15Z-
dc.date.issued2017-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11863-
dc.titleStudy of relationship between labour productivity and time overrun of flyover projects.-
dc.barcode018562-
dc.pagesvi,ii,46,iip.,CD-ROM-
dc.classnoB TH-0697 PAT-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0697.pdf
  Restricted Access
4.9 MBAdobe PDF Request a copy
B TH-0697 Summary.pdf426.93 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.