Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11930
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorShah, Reshma-
dc.contributor.authorSanghvi, Adhish-
dc.date.accessioned2020-11-04T10:36:06Z-
dc.date.available2020-11-04T10:36:06Z-
dc.date.issued2018-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11930-
dc.titleRole of project coordination in construction project - Mahatma Mandir : phase - 2A.-
dc.barcode019816-
dc.pagesix,viii,78p.,CD-ROM-
dc.classnoB TH-0759 SAN-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0759.pdf
  Restricted Access
5.36 MBAdobe PDF Request a copy
B TH-0759 Summary.pdf528.45 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.