Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11935
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorShah, Reshma-
dc.contributor.authorShah, Jaishil-
dc.date.accessioned2020-11-04T10:36:11Z-
dc.date.available2020-11-04T10:36:11Z-
dc.date.issued2018-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11935-
dc.titleStudy on prequalification criteria adopted for contracotr selection on construction projects.-
dc.barcode019820-
dc.pagesvii,viii,57,2p.,CD-ROM-
dc.classnoB TH-0763 SHA-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0763.pdf
  Restricted Access
2.94 MBAdobe PDF Request a copy
B TH-0763 Summary.pdf369.99 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.