Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11969
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorShah, Reshma-
dc.contributor.authorModi, Hitashi-
dc.date.accessioned2020-11-04T10:36:45Z-
dc.date.available2020-11-04T10:36:45Z-
dc.date.issued2019-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11969-
dc.titleStudy of project variations, capstone project : redevelopment of Gandhinagar railway station along with development of 300 rooms hotel building at airspace above station at Gandhinagar, Gujarat.-
dc.barcode021321-
dc.pagesI,v,57p.-
dc.classnoB TH-0795 MOD-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0795.pdf
  Restricted Access
2.28 MBAdobe PDF Request a copy
B TH-0795 Summary.pdf581.53 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.