Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/15786
Title: Comparative analysis between activity based costing and conventional costing as applicable to then Indian construction industry
Authors: Sharma, Aditya
Guide: Gandhi, Sailesh
Issue Date: 2006
URI: http://hdl.handle.net/20.500.12725/15786
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0120.pdf
  Restricted Access
21.42 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.