Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/15963
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAkalkotkar, Prakash V.en_US
dc.contributor.advisorTrivedi, Jyotien_US
dc.contributor.authorShah, Varun-
dc.date.accessioned2020-12-30T10:51:41Z-
dc.date.available2020-12-30T10:51:41Z-
dc.date.issued2010-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/15963-
dc.language.isoenen_US
dc.titleEvaluation and monitoring of time and cost for BRTS project by using EVM and statistical process control techniquesen_US
dc.typeThesisen_US
dc.barcode007061en_US
dc.pagesxii,116,vip.en_US
dc.classnoCPM TH-0183 SHAen_US
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0183.pdf
  Restricted Access
65.51 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.