Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/8966
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPatel, D. R.
dc.contributor.authorRajyagor, Pulin
dc.date.accessioned2020-09-07T14:44:09Z-
dc.date.available2020-09-07T14:44:09Z-
dc.date.issued1998
dc.identifier.urihttp://hdl.handle.net/20.500.12725/8966-
dc.titleTime and cost overruns in construction projects.
dc.barcodeB01804
dc.pagesviii,60p.
dc.classnoCPM TH-0018 RAJ
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File SizeFormat 
CPM TH-0018.pdf
  Restricted Access
29.16 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.