Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9496
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorKhatwani, Deepak
dc.contributor.authorSheth, Chintan K.
dc.date.accessioned2020-09-07T15:03:55Z-
dc.date.available2020-09-07T15:03:55Z-
dc.date.issued2003
dc.identifier.urihttp://hdl.handle.net/20.500.12725/9496-
dc.titleTime and cost management in infrastructure projects.
dc.barcodeB03169
dc.pagesvii,57p.
dc.classnoCPM TH-0079 SHE
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File SizeFormat 
CPM TH-0079.pdf
  Restricted Access
4.52 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.