Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11591
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorTrivedi, Jyoti-
dc.contributor.authorChoksi, Vashishtha-
dc.date.accessioned2020-11-04T10:27:03Z-
dc.date.available2020-11-04T10:27:03Z-
dc.date.issued2018-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11591-
dc.titleIdentification of critical factors affecting extention of time in construction projects.-
dc.barcode019990-
dc.pagesxi,66p.-
dc.classnoCPM TH-0308 CHO-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0308.pdf
  Restricted Access
1.75 MBAdobe PDF Request a copy
CPM TH-0308 Summary.pdf444.7 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.