Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11594
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorDave, Bhargav-
dc.contributor.authorBhatt, Isha D.-
dc.date.accessioned2020-11-04T10:27:04Z-
dc.date.available2020-11-04T10:27:04Z-
dc.date.issued2018-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11594-
dc.titleResource management for construction projects.-
dc.barcode019993-
dc.pagesvii,85p.-
dc.classnoCPM TH-0311 BAT-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0311.pdf
  Restricted Access
3.87 MBAdobe PDF Request a copy
CPM TH-0311 Summary.pdf236.16 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.