Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11611
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorHaryani, Chirag-
dc.contributor.authorDixit, Ashutosh-
dc.date.accessioned2020-11-04T10:27:16Z-
dc.date.available2020-11-04T10:27:16Z-
dc.date.issued2019-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11611-
dc.titleDevelopment of proof of concept for tracking labour productivity using digital innovation in constuction industry.-
dc.barcode021365-
dc.pagesxvii,89p.-
dc.classnoCPM TH-0326 DIX-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0326.pdf
  Restricted Access
2.52 MBAdobe PDF Request a copy
CPM TH-0326 Summary.pdf531.52 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.