Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/16142
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Pandit, Devanshu | en_US |
dc.contributor.author | Joshi, Achal | - |
dc.date.accessioned | 2021-02-09T08:42:25Z | - |
dc.date.available | 2021-02-09T08:42:25Z | - |
dc.date.issued | 2016 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.12725/16142 | - |
dc.language.iso | en | en_US |
dc.title | Factors affecting accuracy of cost estimation in Construction Projects | en_US |
dc.type | Thesis | en_US |
dc.barcode | 022581 | en_US |
dc.pages | viii,94p. | en_US |
dc.classno | CPM TH-0368 JOS | en_US |
Appears in Collections: | Thesis (Faculty of Technology_PG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CPM TH-0368.pdf Restricted Access | 8.73 MB | Adobe PDF | Request a copy | |
CPM TH-0368 Summary.pdf | 385.98 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.