Collection's Items (Sorted by Submit Date in Descending order): 381 to 400 of 1283
Issue Date | Title | Author(s) | Guide(s) |
2019 | Evaluating the level of integration in design process : silo-based design to integrated design approach. | Gattani, Disha | Devkar, Ganesh |
2019 | Success and failure of operation and maintenance contracts in solid waste management. | Bhavsar, Vaibhav Narendrabhai | Pandit, Devanshu |
2019 | Study of subcontractor management in road construction. | Garg, Devendra | Shah, Shridip |
2019 | Development of proof of concept for tracking labour productivity using digital innovation in constuction industry. | Dixit, Ashutosh | Haryani, Chirag |
2013 | Benefit cost analysis for new facilities and system of BRTS projects. | Patel, Hardik V. | Akalkotkar, Prakash V. |
2019 | Application of BIM and Augmented Reality AR in facility management phase. | Kumar, Aathira Satish | Trivedi, Jyoti |
2018 | Integration of lean principles with BIM for construction projects. | Bhat, Vaibhav | Trivedi, Jyoti |
2018 | Schedule risk analysis for construction projects. | Soni, Ishan Pragkumar | Trivedi, Jyoti |
2018 | Bidding strategy for EPC type of construction projects. | Shah, Tirth Manishkumar | Shah, Anish; Trivedi, Jyoti |
2018 | Bidding strategies for design, build, finance, operate and transfer type of construction projects. | Somani, Rahul | Shah, Anish; Trivedi, Jyoti |
2018 | GPS- as a lean construction tool. | Kukreja, Sahil | Karia, Nimitt |
2018 | Assessing sustainability practices during the construction phase. | Thounaojam, Nicola | Devkar, Ganesh |
2018 | Real time simulations of construction projects. | Parihar, Parth | Trivedi, Jyoti |
2018 | Study and appraisal of hybrid annuity model for Gujarat state highway development. | Mehta, Vruja | Deshmukh, Sagar; Trivedi, Jyoti |
2018 | Risk Assessment and allocation of PPP metro rail projects in India. | Naveen, C. G. | Devkar, Ganesh |
2013 | Performance measure of metro rail project using social benefit cost and life cycle costing analysis. | Nayak, Sarverkhan M. | Sarkar, Debasis |
2018 | Critical investigation into applicability of learning curve theory in metro project. | Shah, Maulik B. | Pandit, Devanshu |
2018 | Study of cost factor that affect a construction project. | Pratap, Mayuresh | Sanghvi, Amar |
2018 | Automated dimensional compliance for construction projects. | Sawlani, Lavin | Dave, Bhargav; Trivedi, Jyoti |
2018 | Life cycle cost analysis of prestressed precast concrete pavement : a case study of MBSIR. | Kansagra, Shrujal | Sheth, Anal |
Collection's Items (Sorted by Submit Date in Descending order): 381 to 400 of 1283