Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9713
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorArora, Nilesh-
dc.contributor.advisorIyengar, Shreekant-
dc.contributor.authorPatel, Rajen-
dc.date.accessioned2020-09-10T10:52:10Z-
dc.date.available2020-09-10T10:52:10Z-
dc.date.issued2014-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/9713-
dc.titleStandardization of machine assembly time of shuttle looms machine : a case study at dynamic autolooms India Pvt. Ltd.-
dc.barcode014167-
dc.pages75p.,CD-ROM-
dc.classnoMTM TH-0094 PAT-
Appears in Collections:Thesis (Faculty of Management_PG)

Files in This Item:
File Description SizeFormat 
MTM TH-0094.pdf
  Restricted Access
1.25 MBAdobe PDF Request a copy
MTM TH-0094 Summary.pdf277.98 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.