Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11578
Title: | Cost benefit analysis of construction and demolition waste management. |
Authors: | Sharma, Akshay |
Guide: | Sanghvi, Amar |
Issue Date: | 2018 |
URI: | http://hdl.handle.net/20.500.12725/11578 |
Appears in Collections: | Thesis (Faculty of Technology_PG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CPM TH-0304.pdf Restricted Access | 809.36 kB | Adobe PDF | Request a copy | |
CPM TH-0304 Summary.pdf | 147.98 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.