Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11591
Title: Identification of critical factors affecting extention of time in construction projects.
Authors: Choksi, Vashishtha
Guide: Trivedi, Jyoti
Issue Date: 2018
URI: http://hdl.handle.net/20.500.12725/11591
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0308.pdf
  Restricted Access
1.75 MBAdobe PDF Request a copy
CPM TH-0308 Summary.pdf444.7 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.