Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11599
Title: | Performance measure of metro rail project using social benefit cost and life cycle costing analysis. |
Authors: | Nayak, Sarverkhan M. |
Guide: | Sarkar, Debasis |
Issue Date: | 2013 |
URI: | http://hdl.handle.net/20.500.12725/11599 |
Appears in Collections: | Thesis (Faculty of Technology_PG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CPM TH-0239.pdf Restricted Access | 2.47 MB | Adobe PDF | Request a copy | |
CPM TH-0239 Summary.pdf | 199.71 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.