Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11607
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorTrivedi, Jyoti-
dc.contributor.authorSoni, Ishan Pragkumar-
dc.date.accessioned2020-11-04T10:27:14Z-
dc.date.available2020-11-04T10:27:14Z-
dc.date.issued2018-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11607-
dc.titleSchedule risk analysis for construction projects.-
dc.barcode020005-
dc.pagesvii,69p.-
dc.classnoCPM TH-0323 SON-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0323.pdf
  Restricted Access
1.75 MBAdobe PDF Request a copy
CPM TH-0323 Summary.pdf183.89 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.