Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11642
Title: Integrated schedule and cost model for core wall construction
Authors: Desai, Nihar Hirenbhai
Guide: Matta, Rajesh
Issue Date: 2020
URI: http://hdl.handle.net/20.500.12725/11642
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0355.pdf
  Restricted Access
2.43 MBAdobe PDF Request a copy
CPM TH-0355 Summary.pdf377.74 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.