Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11642
Title: | Integrated schedule and cost model for core wall construction |
Authors: | Desai, Nihar Hirenbhai |
Guide: | Matta, Rajesh |
Issue Date: | 2020 |
URI: | http://hdl.handle.net/20.500.12725/11642 |
Appears in Collections: | Thesis (Faculty of Technology_PG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CPM TH-0355.pdf Restricted Access | 2.43 MB | Adobe PDF | Request a copy | |
CPM TH-0355 Summary.pdf | 377.74 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.