Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11701
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorShah, Shridip-
dc.contributor.authorVerma, Porusraj N.-
dc.date.accessioned2020-11-04T10:33:12Z-
dc.date.available2020-11-04T10:33:12Z-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11701-
dc.titleAnalysis of cost management process adopted by contractors.-
dc.barcode011857-
dc.pages53,viiip.CD-ROM-
dc.classnoB TH-0540 VER-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0540.pdf
  Restricted Access
2.65 MBAdobe PDF Request a copy
B TH-0540 Summary.pdf90.83 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.