Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11813
Title: | Study of contract conditions leading to time and cost overruns in construction projects. |
Authors: | Shah, Charmil |
Guide: | Karia, Nimitt |
Issue Date: | 2016 |
URI: | http://hdl.handle.net/20.500.12725/11813 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0649.pdf Restricted Access | 3.14 MB | Adobe PDF | Request a copy | |
B TH-0649 Summary.pdf | 276.3 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.