Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11850
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Deshmukh, Sagar | - |
dc.contributor.author | Patel , Aniket | - |
dc.date.accessioned | 2020-11-04T10:35:07Z | - |
dc.date.available | 2020-11-04T10:35:07Z | - |
dc.date.issued | 2017 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.12725/11850 | - |
dc.title | Study of time and cost overruns on highrise building projects. | - |
dc.barcode | 018550 | - |
dc.pages | xiii,44p.CD-ROM | - |
dc.classno | B TH-0685 PAT | - |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0685.pdf Restricted Access | 2.11 MB | Adobe PDF | Request a copy | |
B TH-0685 Summary.pdf | 298.58 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.