Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11863
Title: | Study of relationship between labour productivity and time overrun of flyover projects. |
Authors: | Patwa, Nisarg |
Guide: | Tewar, Bhargav |
Issue Date: | 2017 |
URI: | http://hdl.handle.net/20.500.12725/11863 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0697.pdf Restricted Access | 4.9 MB | Adobe PDF | Request a copy | |
B TH-0697 Summary.pdf | 426.93 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.