Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11972
Title: Factors responsible for selection of construction methodology for underground metro stations.
Authors: Mahadik, Jayesh Sharad
Guide: Shah, Paresh
Issue Date: 2019
URI: http://hdl.handle.net/20.500.12725/11972
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0798.pdf
  Restricted Access
14.79 MBAdobe PDF Request a copy
B TH-0798 Summary.pdf269.79 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.