Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/12081
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Trivedi, Jyoti | - |
dc.contributor.author | Mistry, Diptanshu | - |
dc.date.accessioned | 2020-11-04T10:38:22Z | - |
dc.date.available | 2020-11-04T10:38:22Z | - |
dc.date.issued | 2010 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.12725/12081 | - |
dc.title | Time reduction for flyover highway projects - a method study. | - |
dc.barcode | 007266 | - |
dc.pages | viii,53,vi,xiiip.,CD-ROM | - |
dc.classno | B TH-0443 MIS | - |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0443.pdf Restricted Access | 23.31 MB | Adobe PDF | Request a copy | |
B TH-0443 Summary.pdf | 10.66 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.