Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/12082
Title: | Time overruns in multi-storied residential projects. |
Authors: | Shah, Birva C. |
Guide: | Shah, Reshma |
Issue Date: | 2010 |
URI: | http://hdl.handle.net/20.500.12725/12082 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0444.pdf Restricted Access | 2.24 MB | Adobe PDF | Request a copy | |
B TH-0444 Summary.pdf | 61.92 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.