Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/12114
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPandit, Devanshu-
dc.contributor.authorBhavsar, Dhruv-
dc.date.accessioned2020-11-04T10:39:26Z-
dc.date.available2020-11-04T10:39:26Z-
dc.date.issued2011-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/12114-
dc.titleAnalyzing consultant selection procedure and its impact on project performance.-
dc.barcode008638-
dc.pagesiii,1,6,vi,50,xixp.,CD-ROM-
dc.classnoB TH-0477 BHA-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0477.pdf
  Restricted Access
10.31 MBAdobe PDF Request a copy
B TH-0477 Summary.pdf352.34 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.