Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/15810
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAkalkotkar, Prakash V.en_US
dc.contributor.authorIngit, Anand-
dc.date.accessioned2020-12-17T06:17:40Z-
dc.date.available2020-12-17T06:17:40Z-
dc.date.issued2008-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/15810-
dc.language.isoenen_US
dc.titleProductivity improvement using work study in construction projectsen_US
dc.typeThesisen_US
dc.barcode004062en_US
dc.pagesiv,88p.en_US
dc.classnoCPM TH-0138 INGen_US
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0138.pdf
  Restricted Access
45.56 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.