Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/16031
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAkalkotkar, Prakash V.en_US
dc.contributor.authorRaut, Harshal-
dc.date.accessioned2021-01-12T06:17:37Z-
dc.date.available2021-01-12T06:17:37Z-
dc.date.issued2010-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/16031-
dc.language.isoenen_US
dc.titleAnalyzing influencing factors of planning and scheduling for multiple industial construction projecten_US
dc.typeThesisen_US
dc.barcode007058en_US
dc.pagesvi,44p.en_US
dc.classnoCPM TH-0180 RAUen_US
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0180.pdf
  Restricted Access
6.46 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.