Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/16141
Title: Finance-based scheduling for construction projects
Authors: Somani, Govind
Guide: Akalkotar, P. V. (Guide)
Trivedi, Rajnikant (Guide)
Issue Date: 2016
URI: http://hdl.handle.net/20.500.12725/16141
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0376.pdf
  Restricted Access
42.87 MBAdobe PDF Request a copy
CPM TH-0376 Summary.pdf383.51 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.