Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/16592
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorShah, Reshma-
dc.contributor.authorJain, Isha-
dc.date.accessioned2022-05-18T06:05:54Z-
dc.date.available2022-05-18T06:05:54Z-
dc.date.issued2020-21-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/16592-
dc.titleDelays in underground metro construction projects-
dc.barcode023636-
dc.pagesvii,xi,49p.-
dc.classnoB TH-0893 JAI-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0893.pdf
  Restricted Access
3.35 MBAdobe PDF Request a copy
B TH-0893 Synopsis.pdf
  Restricted Access
237.28 kBAdobe PDF Request a copy
B TH-0893 Summary.pdf126.95 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.