Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/2613
Title: | Cost effect in construction projects by applying value engineering. |
Authors: | Mistry, Ishwar |
Guide: | Krishnamurthy, G. |
Issue Date: | 2003 |
URI: | http://hdl.handle.net/20.500.12725/2613 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Size | Format | |
---|---|---|---|
B TH-0263.pdf Restricted Access | 25.01 MB | Adobe PDF | Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.