Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/26926
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorBhatt, Naimish-
dc.contributor.authorGohil, Meet-
dc.date.accessioned2024-09-10T05:40:28Z-
dc.date.available2024-09-10T05:40:28Z-
dc.date.issued2024-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/26926-
dc.titleExamine, assess and improve the efficiency of labour productivity using a lean approach to construction-
dc.barcode026654-
dc.pagesxxiv,235p.-
dc.classnoCEM TH-0445 GOH-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File SizeFormat 
CEM TH-0445.pdf
  Restricted Access
5.85 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.