Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/26940
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorTrivedi, Jyoti-
dc.contributor.authorShah, Kairav-
dc.date.accessioned2024-09-10T05:40:29Z-
dc.date.available2024-09-10T05:40:29Z-
dc.date.issued2024-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/26940-
dc.titleBIM-integrated workflows using power BI for project planning, coupled with AI-based 4D-5D simulation-
dc.barcode026668-
dc.pagesxviii,49p.-
dc.classnoCEM TH-0459 SHA-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File SizeFormat 
CEM TH-0459.pdf
  Restricted Access
2.29 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.