Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/26956
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Devkar, Ganesh | - |
dc.contributor.author | Rane, Viraj | - |
dc.date.accessioned | 2024-09-10T05:47:43Z | - |
dc.date.available | 2024-09-10T05:47:43Z | - |
dc.date.issued | 2024 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.12725/26956 | - |
dc.title | Lean-Led improved architectural design process in engineering, procurement, and construction(EPC) projects | - |
dc.barcode | 026684 | - |
dc.pages | xx,141p. | - |
dc.classno | CEM TH-0475 RAN | - |
Appears in Collections: | Thesis (Faculty of Technology_PG) |
Files in This Item:
File | Size | Format | |
---|---|---|---|
CEM TH-0475.pdf Restricted Access | 16.95 MB | Adobe PDF | Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.