Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9022
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorShah, Paresh
dc.contributor.authorBhatt, Sanjay
dc.date.accessioned2020-09-07T14:45:25Z-
dc.date.available2020-09-07T14:45:25Z-
dc.date.issued1997
dc.identifier.urihttp://hdl.handle.net/20.500.12725/9022-
dc.titleCost control for a construction project.
dc.barcodeB02116
dc.pages36p.
dc.classnoCPM TH-0023 BHA
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File SizeFormat 
CPM TH-0023.pdf
  Restricted Access
13.6 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.