Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9365
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPatel, Devang-
dc.contributor.authorVahora, Nizamuddin A.-
dc.date.accessioned2020-09-07T14:58:23Z-
dc.date.available2020-09-07T14:58:23Z-
dc.date.issued2018-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/9365-
dc.titleComparative study of intermediate termination of cables v/s full length cables in prestressed box girder bridges.-
dc.barcode019606-
dc.pagesxiii,109p.,7Sheets-
dc.classnoSD TH-0166 VAH-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
SD TH-0166.pdf
  Restricted Access
56.06 MBAdobe PDF Request a copy
SD TH-0166 Summary.pdf386.09 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.