Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9486
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAchuthan, Sarala
dc.contributor.advisorModi, Hemant J.
dc.contributor.authorShah, Samir A.
dc.date.accessioned2020-09-07T15:03:23Z-
dc.date.available2020-09-07T15:03:23Z-
dc.date.issued1997
dc.identifier.urihttp://hdl.handle.net/20.500.12725/9486-
dc.titleCost control through project planning and monitoring.
dc.barcodeB01793
dc.pagesvii,..p.
dc.classnoCPM TH-0007 SHA
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File SizeFormat 
CPM TH-0007.pdf
  Restricted Access
6.73 MBAdobe PDF Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.