Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9640
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorArora, Nilesh-
dc.contributor.advisorIyengar, Shreekant-
dc.contributor.authorThacker, Jekin-
dc.date.accessioned2020-09-10T10:49:54Z-
dc.date.available2020-09-10T10:49:54Z-
dc.date.issued2012-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/9640-
dc.titleReduction of through put time in electrotherm ltd. by using value stream mapping in production shop floor-panel shop.-
dc.barcode010091-
dc.pagesiii,81p.-
dc.classnoMTM TH-0022 THA-
Appears in Collections:Thesis (Faculty of Management_PG)

Files in This Item:
File Description SizeFormat 
MTM TH-0022.pdf
  Restricted Access
47.77 MBAdobe PDF Request a copy
MTM TH-0022 Summary.pdf329.91 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.