Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9713
Title: Standardization of machine assembly time of shuttle looms machine : a case study at dynamic autolooms India Pvt. Ltd.
Authors: Patel, Rajen
Guide: Arora, Nilesh
Iyengar, Shreekant
Issue Date: 2014
URI: http://hdl.handle.net/20.500.12725/9713
Appears in Collections:Thesis (Faculty of Management_PG)

Files in This Item:
File Description SizeFormat 
MTM TH-0094.pdf
  Restricted Access
1.25 MBAdobe PDF Request a copy
MTM TH-0094 Summary.pdf277.98 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.