Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11599
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSarkar, Debasis-
dc.contributor.authorNayak, Sarverkhan M.-
dc.date.accessioned2020-11-04T10:27:08Z-
dc.date.available2020-11-04T10:27:08Z-
dc.date.issued2013-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11599-
dc.titlePerformance measure of metro rail project using social benefit cost and life cycle costing analysis.-
dc.barcode012646-
dc.pagesvii,70p.,CD-ROM-
dc.classnoCPM TH-0239 NAY-
Appears in Collections:Thesis (Faculty of Technology_PG)

Files in This Item:
File Description SizeFormat 
CPM TH-0239.pdf
  Restricted Access
2.47 MBAdobe PDF Request a copy
CPM TH-0239 Summary.pdf199.71 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.