Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11775
Title: Analyzing the major causes for delay and subsequent cost overrun in container terminal projects.
Authors: Joshi, Saransh
Guide: Pandya, Chirayu
Issue Date: 2016
URI: http://hdl.handle.net/20.500.12725/11775
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0616.pdf
  Restricted Access
6.89 MBAdobe PDF Request a copy
B TH-0616 Summary.pdf467.96 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.