Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/11775
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPandya, Chirayu-
dc.contributor.authorJoshi, Saransh-
dc.date.accessioned2020-11-04T10:33:57Z-
dc.date.available2020-11-04T10:33:57Z-
dc.date.issued2016-
dc.identifier.urihttp://hdl.handle.net/20.500.12725/11775-
dc.titleAnalyzing the major causes for delay and subsequent cost overrun in container terminal projects.-
dc.barcode016546-
dc.pagesvi,36,iip. CD-ROM-
dc.classnoB TH-0616 JOS-
Appears in Collections:Thesis (Faculty of Technology_UG)

Files in This Item:
File Description SizeFormat 
B TH-0616.pdf
  Restricted Access
6.89 MBAdobe PDF Request a copy
B TH-0616 Summary.pdf467.96 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.