Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11775
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Pandya, Chirayu | - |
dc.contributor.author | Joshi, Saransh | - |
dc.date.accessioned | 2020-11-04T10:33:57Z | - |
dc.date.available | 2020-11-04T10:33:57Z | - |
dc.date.issued | 2016 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.12725/11775 | - |
dc.title | Analyzing the major causes for delay and subsequent cost overrun in container terminal projects. | - |
dc.barcode | 016546 | - |
dc.pages | vi,36,iip. CD-ROM | - |
dc.classno | B TH-0616 JOS | - |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0616.pdf Restricted Access | 6.89 MB | Adobe PDF | Request a copy | |
B TH-0616 Summary.pdf | 467.96 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.