Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11775
Title: | Analyzing the major causes for delay and subsequent cost overrun in container terminal projects. |
Authors: | Joshi, Saransh |
Guide: | Pandya, Chirayu |
Issue Date: | 2016 |
URI: | http://hdl.handle.net/20.500.12725/11775 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0616.pdf Restricted Access | 6.89 MB | Adobe PDF | Request a copy | |
B TH-0616 Summary.pdf | 467.96 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.