Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/11850
Title: | Study of time and cost overruns on highrise building projects. |
Authors: | Patel , Aniket |
Guide: | Deshmukh, Sagar |
Issue Date: | 2017 |
URI: | http://hdl.handle.net/20.500.12725/11850 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0685.pdf Restricted Access | 2.11 MB | Adobe PDF | Request a copy | |
B TH-0685 Summary.pdf | 298.58 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.